--- Epcos Power Factor Controller Br 5016 Manual Pdf fd.lod.bz (English)

--- Epcos Power Factor Controller Br 5016 Manual Pdf [better] Jun 2026

: Ensure Current Transformers (CT) are installed in the correct direction (load side) for accurate measurement. Phase Correction

Includes one isolated RS232 interface for dedicated EPCOS protocols, with optional GSM connectivity for remote monitoring. Operational Modes --- Epcos Power Factor Controller Br 5016 Manual Pdf

| Code | Parameter | Typical Setting | Explanation | | :--- | :--- | :--- | :--- | | C/F | Current transformer ratio | e.g., 2000/5 | Must match your physical CT. | | U | Nominal voltage | 400V or 480V | System line-to-line voltage. | | C-- | Target Cos φ | 0.92 to 0.95 | The manual warns: setting 1.00 may cause hunting. | | t-- | Switching delay | 15 to 60 seconds | Time before controller reacts to changes. | | P no | Number of steps | 1 to 16 | Set to the actual number of capacitor stages. | | P5 | Sequence type | 1:1:1 or 1:2:4 | Linear or binary stepping. | : Ensure Current Transformers (CT) are installed in

Power factor (PF) is the ratio of real power (active power) to apparent power (vector sum of real and reactive power) in an AC power system. A low power factor indicates the presence of reactive power, which can lead to: | | U | Nominal voltage | 400V

Available languages: English, Deutsch, français, Türkçe, Svenska
page last modified on Wed Jan 28 04:01:40 EST 2026